| Lumut
Port
|
|
|
|
Ports
|
Port
Authorities |
Port
Operators
|
|
|
| Operated
by
Lumut
Maritime
Terminal
Sdn Bhd |
|
|
|
Lot
1,
Lumut
Port
Industrial
Park
Mukim
Lumut,
Jalan
Kg Aceh,
32000
Setiawan.
Perak
Darul Ridzuan.
Tel
:
05-6928111
Fax
:
05-6928120
Email:
lmt@tm.net.my
Homepage:
www.lumutport.com
|
| |
|
YOUR
CONTACT: |
|
Kuala Lumpur
Director:
En. Harun Halim Rasip
Port
Matters (Head Office)
General Manager:
Mr. Kwek Chee Wah
Operations Manager:
Mr. M. Ramachandran
Marketing Manager:
Mr. Khoo Ong Chuan
Finance Manager:
Mr. David Lo
Services Manager:
En. Abu Samah
Industrial Park (LPIP)
Senior Executive (Property):En. Mohamed Shahfinaz
|
|
|
|
PORT
INFORMATION: |
|
Lumut
Port
commenced
operations
on
July
1,
1995.
Built,
owned
and
operated
by
Lumut
Maritime
Terminal
Sdn
Bhd.
Shareholders
are
Perak
State
Developments
Corporation,
Halim
Rasip
Holdings
Sdn
Bhd
and
Ipco
International
Ltd.
Encompasses
a
port
(32.4
ha)
and
Industrial
Land
(445
ha).
|
|
|
|
LOCATION |
|
Lumut Port is located on the west coast of Peninsula Malaysia in the State of Perak Darul Ridzuan, along the banks of the Dindings River at latitude 4 degrees 15.3 minutes North and longitude 100 degrees 39.6 minutes east directly off the Straits of Malacca. Located
about
78
km
from
Ipoh
and
240
km
from
Kuala
Lumpur.
|
|
|
|
NAVIGABLE CHANNEL |
|
Minimum depth - 7.0 metres at any time / Maximum depth - 9.3 metres at high tide |
|
|
|
PORT WORKING HOURS |
| 3 shifts, 24 hours a day, 365 days per year. |
| |
|
ADMINISTRATIVE WORKING HOURS |
|
0830
- 1700 Mondays to Fridays / 0830 - 1230
Saturdays. Closed on Sundays and Public
Holidays |
| |
|
TERMINAL TYPE |
|
Gazetted Royal Custom's Port Common User Port, designed and equipped to handle dry bulk, conventional breakbulk, container and heavy project cargo. |
| |
|
PILOTAGE: |
|
Frequency
:
Ch 12
,
14
Procedure
:
i. Pilotage
is
compulsory
for
the
terminal
and
is available 24hrs.
ii. A Notice
of Arrival (NOV) should be sent through
the agent,72h
before
ETA
iii. An inport/inward
manifest should be sent through the agent,48h
before
the
vessel's
arrival.
iv An
application for a berth is made once the
ETA is confirmed but not later than
24h before the vessels arrival.
v.
Pilot
boards
in
position
4
10'
.5N
100
35'.0E
(S
of
Pulau Pangkor)
|
| |
|
FACILITIES
SUMMARY: |
| |
|
Berthing
Facility |
|
Type
of
Berth |
Length
(m) |
Depth
(m) |
Max Vessel Size
(DWT) |
|
Marine
berth |
230 |
10 |
35,000 |
|
Barge
berth |
58 |
3.5 |
7,000 |
|
Liquid
bulk |
Future
plans
Phase
II |
- |
40,000 |
|
Dedicated
berths |
Future
plans
Phase
III |
- |
35,000 |
|
| |
|
Storage
:
Open
(60,000
sq
metres)
and
covered
storage
(5,100
sq
metres)
for
containers
and
general
break
bulk
cargo.
Heavy
and
medium
load
open
storage
areas
for
bulk
and
other
cargoes.
Loading
platform,
mooring
dolphins
and
tank
storage
farms
for
liquid
bulk
handling.
|
| |
|
Compiled by Ports World Sdn Bhd |
| |
|