BEN DAM - CON DAO VUNG TAU PORT
 

Ports | Port Authorities | Port Operators   

 

1. Port's name & contact address:

Under: The People's Committee of Con Dao District


Port's location:

1. Ben Dam - Con Dao Terminal:
08°35'00"N - 106°33'00"E
Pilot boarding position: 08°40'30"N - 106°32'42"E

 
2. Con Dao - Vung Tau Terminal:
10°24'40"N - 107°03'00"E
1007/36 đường 30/4, P.11, Tp.Vũng Tàu, tỉnh Bà Rịa - Vũng Tàu

 

Office: Management board of Ben Dam - Con Dao Vung Tau Port:
1007/36 str., Ward 11, Vung Tau city, Ba Ria - Vung Tau province
Tel: (84.64) 621047 - Fax: (84.64) 621047
Email: bqlcbd-hcd@hcm.vnn.vn

 

2. Management

Director

Mr. Đinh Quang Đông
Tel: 84.64.621042

Vice Director

Mr Nguyen Huu Tai
Tel: 84.64.830050

Vice Director

Mr Le Xuan Huy
Tel: 84.64.621187

  

3. Access channel:
. Ben Dam-Con Dao Terminal:
Length: 5km
Channel depth: -9.5m
Tidal regime: semi-diurnal
Average tidal range: 3m
Max. draft: 9.5m
Maximum size of vessel accepted: 2,000 DWT

 

. Con Dao - Vung Tau Terminal:
Length: 14km
Channel depth: -4.5m
Tidal regime: semi-diurnal
Average tidal range: 3.8m
Max. draft: 7m
Maximum size of vessel accepted: 2,000 DWT

 

4. Infrastructure and equipment:

.Berth facilities:

Name/No.

Length (m)

Depth alongside (m)

Vessel/Cargoe

Ben Dam wharf 2000 WDT

82

9.0

Cargo vessel and cruise

Ben Dam wharf 500 DWT

74.5

5.5

Con Dau tourist berth

30

2.5

Con Dao-Vung Tau terminal

110

5.0

 

 

. Storage facilities:
 
Ben Dam - Con Dao Terminal:
Total area: 24,000m2
of wich 5,725m2 open storage

 

Con Dao-Vung Tau Terminal:
Total area: 20,300m2
of wich 500m2 of warehouse

 
. Major equipment:

Type

No.

Capacity

Shore crane

1

5 MT

Forklift

2

2.5 MT

Transport vessel

2

 

Canoe

2

12HP & 90HP

 

5. Cargo throughput:

 

2003

2004

2005

Total

85,000 MT

156,000 MT

204,290 MT

Import

5,000 MT

0

 

Export

nil

0

 

Domestic

80,000 MT

156,000 MT

204,290 MT

Ship calls

7,525

include 122 cargo vessels and 6,004 off-shore fishing boats

221 including 122 cargo vessels and 3,437 off-shore fishing boats

 

6. Development Plans

Project

Investment capital

Time planning & status implementation

Upgrading Con Dao - Vung Tau Terminal

VND 33.5 billion

2006 - 2007

Construction of 300T cold storage at Ben Dam-Con Dao Terminal

VND 8 billion

2006 - 2007

Construction of 3.2ha yards/warehouses at Ben Dam-Con Dao Terminal

VND 22 billion

2007-2008

Rehabilitation and upgrading of Con Dao Tourist Berth

VND 66 billion

2007-2009

   

7. Main services
Stevedoring, leasing means of handling transport, supply of fishing logistics and passenger services

 

Compiled by portsworldvietnam.com 
  