BEN DAM - CON DAO VUNG TAU PORT |
|
|
|
Ports
|
Port
Authorities |
Port
Operators
|
| |
|
1. Port's
name & contact address: |
|
Under: The People's
Committee of Con Dao District
Port's location:
1. Ben Dam - Con Dao
Terminal:
08°35'00"N - 106°33'00"E
Pilot boarding position: 08°40'30"N - 106°32'42"E
2. Con Dao - Vung Tau Terminal:
10°24'40"N - 107°03'00"E
1007/36 đường 30/4, P.11, Tp.Vũng Tàu, tỉnh Bà Rịa - Vũng Tàu
Office: Management board
of Ben Dam - Con Dao Vung Tau Port:
1007/36 str., Ward 11, Vung Tau city, Ba Ria - Vung Tau province
Tel: (84.64) 621047 - Fax: (84.64) 621047
Email:
bqlcbd-hcd@hcm.vnn.vn |
|
|
|
2.
Management |
|
Director
|
Mr. Đinh Quang Đông
Tel: 84.64.621042 |
|
Vice Director |
Mr
Nguyen Huu Tai
Tel: 84.64.830050 |
|
Vice Director |
Mr Le
Xuan Huy
Tel: 84.64.621187 |
|
|
|
|
3. Access
channel:
.
Ben Dam-Con Dao Terminal:
Length: 5km
Channel depth: -9.5m
Tidal regime: semi-diurnal
Average tidal range: 3m
Max. draft: 9.5m
Maximum size of vessel accepted: 2,000 DWT
.
Con Dao - Vung Tau
Terminal:
Length: 14km
Channel depth: -4.5m
Tidal regime: semi-diurnal
Average tidal range: 3.8m
Max. draft: 7m
Maximum size of vessel accepted: 2,000 DWT |
|
|
|
4.
Infrastructure and equipment: |
|
.Berth facilities: |
|
Name/No. |
Length (m) |
Depth alongside
(m) |
Vessel/Cargoe |
|
Ben Dam wharf 2000
WDT |
82 |
9.0 |
Cargo vessel and
cruise |
|
Ben Dam wharf 500
DWT |
74.5 |
5.5 |
|
Con Dau tourist
berth |
30 |
2.5 |
|
Con Dao-Vung Tau
terminal |
110 |
5.0 |
|
|
|
|
. Storage facilities:
Ben Dam - Con Dao
Terminal:
Total area: 24,000m2
of wich 5,725m2 open storage
Con Dao-Vung Tau
Terminal:
Total area: 20,300m2
of wich 500m2 of warehouse
. Major equipment: |
|
Type |
No. |
Capacity |
|
Shore crane |
1 |
5 MT |
|
Forklift |
2 |
2.5 MT |
|
Transport vessel |
2 |
|
|
Canoe |
2 |
12HP & 90HP |
|
|
|
|
5. Cargo
throughput: |
|
|
2003 |
2004 |
2005 |
|
Total |
85,000 MT |
156,000 MT |
204,290 MT |
|
Import |
5,000 MT |
0 |
|
|
Export |
nil |
0 |
|
|
Domestic |
80,000 MT |
156,000 MT |
204,290 MT
|
|
Ship calls |
7,525 |
include 122
cargo vessels and 6,004 off-shore fishing boats |
221 including
122 cargo vessels and 3,437 off-shore fishing boats |
|
|
|
|
|
6.
Development Plans |
|
Project |
Investment
capital |
Time planning & status implementation |
|
Upgrading Con Dao - Vung Tau Terminal |
VND 33.5 billion |
2006 - 2007 |
|
Construction of 300T cold storage at Ben Dam-Con Dao Terminal |
VND 8 billion |
2006 - 2007
|
|
Construction of 3.2ha yards/warehouses at Ben Dam-Con Dao Terminal |
VND 22 billion |
2007-2008 |
|
Rehabilitation and upgrading of Con Dao Tourist Berth |
VND 66 billion |
2007-2009 |
|
|
|
|
7. Main
services
Stevedoring,
leasing means of handling transport, supply of fishing logistics and
passenger services |
|
|
|