Port's name: CHAN MAY PORT
Under: The People's Committee of Thua Thien Hue province
Port's location: 16°20'00"N - 108°00'00"E
Address: Loc Vinh commune, Phu Loc district, Thua Thien Hue province
Tels: 84.54.876096 / 820449
Fax: 84.54.891838 / 833577
Pilot boarding position: 16°21'17"N - 108°00'00"E
Office: 14 Le Loi street, Hue city, Thua Thien-Hue province
Tels. No.: 84.54.820449 Fax No.: 84.54.833577
E-mail:
chanmay@dng.vnn.vn
Website:
www.chanmaycity.com.vn /
www.chanmayport.com |
|
|
|
2.
Management |
|
Acting Director |
Mr. Nguyen Huu Tho
Tel: 84.54.833596 |
|
|
|
|
3. Access
channel:
Length: 2.7 km.
Channel depth: -12.0 m.
Maximum draft: 12m
Tidal regime: irregular semi-diurnal
Average tidal range: 0.8 m.
Maximum size of vessel accepted: 30,000 DWT |
|
|
|
4.
Infrastructure and equipment: |
|
.Berth facilities: |
|
Name/No. |
Length |
Depth alongside |
Vessel/Cargo |
|
Berth No.1,
Jetty |
300 m |
-12,5 m |
Conventional cargo/container vessel 30,000 DWT,
passenger vessel with LOA up to 345m |
|
Berth No.1
inner side |
120 m |
-8,5 m |
Conventional cargo vessel 2,000 DWT |
|
|
|
|
. Storage facilities:
Total area:
30,000 m2, of which:
Warehouse/shed: 1,980 m2.
Open storage: 13,850 m2
Total storage capacity: 500,000 MT
. Major equipment: |
|
Type |
No. |
Capacity |
|
Mobile harbour
crane |
1 |
63 MT |
|
Rubber-tyred
crane |
1 |
25 MT |
|
Crawler crane |
1 |
60 MT |
|
Reach stacker |
1 |
45 MT |
|
Forklift |
3 |
3,5 MT |
|
Tractor with
chassis |
2 |
45 MT |
|
Tug boat |
2 |
1,020HP/1,800HP |
|
Excavator |
1 |
3,5 m3 |
|
Bulldozer |
2 |
2 m3 |
|
|
|
|
5. Cargo
throughput: |
|
|
2005 |
|
Total |
402,000 MT |
|
Import |
14,911 MT |
|
Export |
199,682 MT |
|
Domestic |
187,407 MT |
|
Ship calls |
150 |
|
|
|
|
|
|
Major
imports |
Major exports |
|
Electrical appliances, general cargoes,
oversized/overweighed cargoes, equipment and machinery |
Major exports: wood chips, woodlog materials,
white sand, titanium |
|
|
|
|
6.
Development Plans |
|
Project |
Investment capital |
Time planning |
|
Expanding 3 ha of yard |
VND 40 billion |
Under construction to be completed in 2006 |
|
Constructing berth No.2 and No.3 with 440 m
length in total, and 27 hectares of yards |
VND 820 billion |
2006-2010. Feasibility study being carried out |
|
|
|
|
7. Main
services
Cargo handling,
transporting, tallying, and warehousing. Warehouse and yard leasing. Tug
assistance. Shipchandlers. Shipping agency and brokers. Mechanic repairs. Im/export
and marine services. |
|
|
|
Compiled by portsworldvietnam.com |
| |
|
Ports
|
Port Authorities |
Port Operators
|
| |
|
|