CUA CAM
 

Ports | Port Authorities | Port Operators   

 

1. Port's name & contact address:

Port's name: CUA CAM PORT JOINT-STOCK COMPANY
Under: Hai Phong City's Dept. of Transport and Public Works
Port's location: 20°52'N - 106°41'E
Pilot boarding position: 20°40'N - 106°51'E
Address: 2 Ngo Quyen street, Ngo Quyen district, Hai Phong city
Tels. No.: 84.31.837391 / 837393
Fax No.: 84.31.837393
E-mail: camport@hn.vnn.vn

 

2. Management

   Director

Mr. Nguyen VanPhong
Tel: 84.31.837392

   Vice Director, Operations

 Mr. Nguyen Hy Lap
Tel: 84.31.654072

   Vice Director, Engineering

Mr. Hoang Dinh Dat
Tel: 84.31.768091

   Vice Director, Administration

Mr. Nguyen Ngoc Vung
Tel: 84.31.827037

  

3. Access channel:
- Length 20 km.
- Channel depth: -4.5 m.
- Tidal regime: diurnal.
- Average tidal range: 2.5 m.
- Maximum draft: 5.5 m.
- Maximum size of vessel accepted: 5,000 DWT

 

4. Infrastructure and equipment:

.Berth facilities:

Name/No.

Length

Depth alongside

Vessel/Cargo

 No. 1

75 m

-5.0 m

General cargo

 No. 2

120 m

-7.0 m

General cargo / container

 No. 3

76 m

-5.0 m

General / Liquid cargoes

 No. 4

76 m

-2.5 m

General cargo

 

 

. Storage facilities:

Total port area: 27,000 m2
Open storage: 20,000 m2. of which container yard: 4,000 m2
Tank: 1,800 m2
Total storage capacity: 15,000 MT.

. Major equipment:

Type

No.

Capacity

  Shore crane

8

12 ~ 36 MT

 

5. Cargo throughput:

 

2001

2002

2003

2000

2005

Total

56,000 MT

160,000 MT

220,000 MT

35,250 MT

380,000 MT

Import

35,000 MT

55,000 MT

65,000 MT

12,500 MT

130,000 MT

Export

21,000 MT

10,000 MT

12,000 MT

1,350 MT

Nil

Domestic

16,000 MT

95,000 MT

143,000 MT

21,400 MT

250,000 MT

Container

1,000 Teus

600 Teus

800 Teus

200 Teus

7,000 TEUs

Ship calls

300

600

240

118

210

 

 

   Major imports

   Domestic cargoes

 

 Steel: 80,000 MT  Bagging cargoes: 125,000 MT
 Oil/Liquids: 30,000 MT  Wood logs: 40,000 MT
   Container: 20,000 MT
   Steels: 60,000 MT
 

6. Development Plans

1.       Upgrading wharf and warehouse/yard:
- Total cost of investment: VND 5.5 billion
- Implementaiton: 2006

 

7. Main services
Cargo handling. Marine general services. Ship repairs

 

Compiled by portsworldvietnam.com 
  

Ports | Port Authorities | Port Operators   

  
Copyright 2007.  Ports World Sdn Bhd
 HomePort Location | Port Operators | Shipping ServicesWeb Links | Calendar | About Us | Contact Us