|
|
|
|
|
| |
|
DA NANG PORT |
|
|
|
Ports
|
Port
Authorities |
Port
Operators
|
| |
|
1. Port's
name & contact address: |
|
Port's name: DA NANG PORT
Under: Vietnam National Shipping Lines
Port's location: 16°07'02"N - 108°12'03"E
Pilot boarding position: 16°10'N - 108°11'E
Address: 26 Bach Dang street, Da Nang city
Tels: 84.511.822513 / 835675
Fax: 84.511.822565
E-mail:
cangdn@dng.vnn.vn
Website:
http://www.danangport.com |
|
|
|
2.
Management |
|
Director General |
Mr. Nguyen
Thu
Tel: 84.511.821114 |
|
Deputy Director General, Bussiness |
Mr. Nguyen
Huu Sia
Tel: 84.511.822512 |
|
Deputy Director General, Operations |
Mr. Pham
Ngoc The
Tel: 84.511.835675 |
|
Deputy Director General, Engineering |
Mr. Nguyen
Xuan Dung
Tel: 84.511.822517 |
|
|
|
|
3. Access
channel:
- Length 7 km.
- Channel depth: -12.0 m.
- Tidal regime: semi-diurnal.
- Average tidal range: 0.9 m.
- Max. draft: 12 m.
- Maximum size of vessel accepted: <= 50,000 DWT |
|
|
|
4.
Infrastructure and equipment: |
|
.Berth facilities: |
|
Name/No. |
Length |
Depth alongside |
Vessel/Cargo |
|
Wharf No.1
Tien Sa |
182 m |
-11.0 m |
vessel <= 45,000 DWT |
|
Wharf No.2
Tien Sa |
182 m |
-10.0 m |
vessel <= 45,000 DWT |
|
Wharf No.3
Tien Sa |
182 m |
-11.0 m |
|
Wharf No.4
Tien Sa |
182 m |
-11.0 m |
|
Wharf No.5
Tien Sa |
225 m |
-12.0 m |
|
Wharf No.1
Song Han |
140 m |
-7 m |
G. C. vessel 5,000 T |
|
Wharf No.2
Song Han |
100m |
-7 m |
|
Wharf No.3
Song Han |
100m |
-7 m |
|
Wharf No.4
Song Han |
92 m |
-7 m |
|
Wharf No.5
Song Han |
93 m |
-7 m |
|
|
|
|
. Storage facilities:
Total port
area: 295,150 m2, of which:
Warehouse/shed: 21,634 m2. Open storage: 186,800 m2
Total storage capacity: 350,000 MT
. Major equipment: |
|
Type |
No. |
Capacity |
|
Quayside crane |
1 |
36 MT |
|
Rubber-typed
gantry crane |
2 |
36 MT |
|
Shore crane |
20 |
10 ~ 80 MT |
|
Forklift |
31 |
1.5 ~ 42 MT |
|
Tractor with
chassis |
13 |
12 ~ 40 MT |
|
Tug boat |
7 |
350 HP & 1700 HP |
|
Dump truck |
8 |
8 ~ 15MT |
|
|
|
|
5. Cargo
throughput: |
|
|
2001 |
2002 |
2003 |
2004 |
2005 |
|
Total |
1,710,000 MT |
2,074,048 MT |
2.178.588 MT |
2,308, 973 MT |
2,256,068 MT |
|
Import |
646,212 MT |
802,751 MT |
824.305 MT |
724,668 MT |
778,440 MT |
|
Export |
428,685 MT |
511,166 MT |
554.147 MT |
739,850 MT |
5,171 MT |
|
Domestic |
636,103 MT |
760,131 MT |
800.136 MT |
844,455 MT |
882,457 MT |
|
Container |
26,303 Teus |
30,882 Teus |
27.163 TEUs |
32,416 TEUs |
32,343 TEUs |
|
Ship calls |
779 |
920 |
894 |
1,026 |
1,290 |
|
|
|
|
| |
|
Major imports |
Major exports |
|
Clinker 205,009 MT |
Sandal chips 413,868 MT |
|
Container 158,281 MT |
Sand 180,156 MT |
|
Fertilizer 44,421 MT |
Container 105,506 MT |
|
Steel 46,117 MT |
|
|
Domestic cargoes consist of klinker, cement, container, and
coal |
|
|
|
|
|
|
6.
Development Plans |
|
Project |
Investment
capital |
Time planning & status implementation |
|
Expanding of break water |
VND 174,000 million |
2005-2006 |
|
Construction of cargo storage complex |
VND 29,000 million |
2006-2007 |
|
Purchase of 4 shore cranes with lifting
capacity of 25,40, and 80 Tons |
VND 35,000 million |
2006-2007 |
|
Purchase of 1 tugboat 1,000 HP |
VND 10,000 million |
2006-2007 |
|
Purchase of means of land
transportation |
VND 5,000 million |
2006-2007 |
|
|
|
|
7. Main
services
Cargo handling,
tallying, warehousing.
Tug assistance to vessels entering into/depart from
the port.
Transporting and freight forwarding agency. Building and repairing
of construction works. Repairing means of transportation.
Supply of
fuel/oil, fresh water and food provisions to ocean vessels.
Garbage removal.
Rust chipping.
Shipping agency, and other marine related services.
|
|
|
|
Compiled by portsworldvietnam.com |
| |
|
Ports
|
Port Authorities |
Port Operators
|
| |
|
|
|
|
|
|