DOAN XA |
|
|
|
Ports
|
Port
Authorities |
Port
Operators
|
| |
|
1. Port's
name & contact address: |
|
Port's name:
DOAN XA PORT JOINT-STOCK COMPANY
Under: Hai Phong
City's Dept. of Transport and Public Works
Port's location:
20°52'N - 106°41'E
Pilot boarding position:
20°40'N - 106°51'E
Address: 15 Ngo
Quyen str., Van My ward, Ngo Quyen dist., Hai Phong city
Tels. No.:
84.31.767949 / 765029
Fax: 84.31.765727
E-mail:
doanxaport@hn.vnn.vn |
|
|
|
2.
Management |
|
Director |
Mr. Dao Van
Then
Tel: 84.31.767949 |
|
Vice Director, Operations |
Mr.
Nguyen Van Phu
Tel: 84.31.767796 |
|
Vice Director, Engineering |
Mr. Vu Tuan
Duong
Tel: 84.31.767969 |
|
|
|
|
3. Access
channel:
-
Length 30 km.
-
Channel depth: -4.5 m.
-
Tidal regime: diurnal.
-
Average tidal range:
3.0 m.
-
Maximum draft: -8.4 m.
-
Maximum size of vessel
accepted: 10,000 GRT |
|
|
|
4.
Infrastructure and equipment: |
| |
|
.Berth facilities: |
|
Name/No. |
Length |
Depth alongside |
Vessel/Cargo |
|
Wharf No.1 |
110 m |
-8.4 m |
Break bulk/bulk cargoes, container |
|
Wharf No.2 |
110 m |
-8.4 m |
|
|
|
|
. Storage facilities:
Total port area: 120,000
m2
Warehouse/shed: 3,000 m2.. Open storage: 80,000 m2.
Total storage capacity: 100,000 MT, of which container yard: 70,000 m2.
. Major equipment: |
|
Type |
No. |
Capacity |
|
Shore crane |
4 |
6 ~ 40MT |
|
Container
lifter |
1 |
45 MT |
|
Forklift truck |
4 |
4 ~ 5 MT |
|
Truck
|
3 |
8 MT |
|
Tractor +
trailer |
4 |
30 MT |
|
|
|
|
5. Cargo
throughput: |
|
|
2002 |
2003 |
2004 |
2005 |
|
Total |
230,306 MT |
454,000 MT |
1,005,761 MT |
1,428,242 MT |
|
Import |
121,173 MT |
271,000 MT |
174,323 MT |
270,839 MT |
|
Export |
8,146 MT |
63,000 MT |
285, 224 MT |
209,930 MT |
|
Domestic |
100,387 MT |
120,000 MT |
547,214 MT |
947,473 MT |
|
Container |
TEUs |
9,313 TEUs |
51,733 TEUs |
75,264 TEUs |
|
Ship calls |
150 |
150 |
265 |
178 |
|
|
|
|
|
6.
Development Plans |
|
Project |
Total
investment |
Implementation |
|
Expanding wharf anf open
storage at Dinh Vu area |
VND 100 billion |
The project being started in July 2006 |
|
Purchase of 1 unit of 45-tons
forklift and 1 unit of Tuken
slewing crane |
VND 25 billion |
Being implemented in the late-six-months of
2006 |
|
|
|
|
7. Main
services
Cargo handling,
bagging, warehousing, and transporting. Mechanics repairs. Ship agents |
|
|
|
Compiled by portsworldvietnam.com |
| |
|