|
|
|
|
|
| |
|
DONG NAI PORT |
|
|
|
Ports
|
Port
Authorities |
Port
Operators
|
| |
|
1. Port's
name & contact address: |
|
Port's name:
DONG NAI PORT JOINT-STOCK CO
Under: SONADEZI
Port's location:
- Long Binh Tan Terminal: 10°54'01"N - 106°50'29"E
- Go Dau A Terminal: 10°39'28"N - 107°01'16"E
- Go Dau B Terminal: 10°37'08"N - 107°01'26"E
Pilot boarding position: 10°20'N - 107°02'E
Main office: Long
Binh Tan ward, Bien Hoa city, Dong Nai province
Tel: 84.61.832225/831439/543328
Fax: 84.61.831259
E-mail:
dongnai-port@hcm.vnn.vn
Website:
www.dongnai-port.com
Go Dau A Terminal office:
Phuoc Thai commune, Long
Thanh Dist., Dong Nai Pro.
Tel: 84.61.827328
Fax: 84.61.841252
Go Dau B Terminal office:
Phuoc Thai commune, Long
Thanh Dist., Dong Nai Pro.
Tel: 84.61.841599
Fax: 84.61.816790 |
|
|
|
2.
Management |
|
Director: |
Mr. NGUYEN MANH TIEN
Tel: 0.61.831733 |
|
Vice Director
General |
Mr.
PHAM VAN QUYEN
Tel: 0.61.841252 |
|
Vice Director
General |
Mr. DO VAN SAM
Tel: 0.61.831803 |
|
|
|
|
3. Access
channel:
. to Long Binh Tan Terminal
situated on the Dong Nai river:
Length 100 km.
Channel depth: 4m.
Tidal regime: irregular semi-diurnal.
Average tidal range: 3.0 m.
Draft highest for vessels calling in/out: 6.2m.
Maximum size of vessel accepted: 5,000 DWT.
. to Go Dau A and Go Dau B
Terminals situated on the Thi Vai river:
Length 35 km.
Draft: 7.5m (to Go Dau A) & 9.5m (to Go Dau B).
Tidal regime: irregular semi-diurnal.
Average tidal range: 4.6 m.
Maximum size of vessel accepted at Go Dau A wharf: vessel 2,000 DWT
Go Dau B: vessel 12,000 DWT. |
|
|
|
4.
Infrastructure and equipment: |
|
.Berth facilities: |
|
Name / No. |
Length (m) |
Depth alongside |
Vessel/Cargo |
|
K1 Long Binh Tan |
60,2 |
-7,5 |
General cargoes |
|
K2 Long Binh Tan |
72 |
-8.3 |
|
K3 Long Binh Tan |
10 |
-3.5 |
|
K4 Long Binh Tan |
20 |
-3.5 |
|
K5 Long Binh Tan |
10 |
-3.0 |
|
A1 Go Dau |
30 |
-7.5 |
|
A2 Go Dau |
33 |
-7.5 |
Liquid cargoes |
|
B1 Go Dau |
72.5 |
-8.5 |
General cargoes |
|
B2 Go Dau |
120 |
-9.0 |
|
B3 Go Dau |
20 |
-4.0 |
|
|
|
|
. Storage facilities:
Total port
area:
Long Binh Tan: 443,000 m2
(Long Binh Tan: 43,000
m2, Go Dau A: 180,000 m2, Go Dau B: 220,000 m2)
Warehouse/shed: 5,000 m2.
Open storage: 80,000 m2.
Tank: 3.000 m3
Total storage: 200.000 ta^'n
. Major equipment: |
|
Type |
No. |
Capacity |
|
Shore
crane |
9 |
25 ~ 60 MT |
|
Forklift |
6 |
5 ~ 10 MT |
|
Tractor |
3 |
|
|
Truck
|
5 |
|
|
|
|
|
5. Cargo
throughput: |
|
|
2002 |
2003 |
2004 |
2005 |
|
Total |
1,127,000 MT |
1,420,872 MT |
1,620,000 MT |
1,612,000 MT |
|
Import |
460,000 MT |
542,954 MT |
708,054 MT |
763,000 MT |
|
Export |
52,000 MT |
33,527 MT |
53,149 MT |
35,000 MT |
|
Domestic |
615,000 MT |
844,392 MT |
858,797 MT |
814,900 MT |
|
Ship calls |
601 |
800 |
800 |
760 |
|
|
|
|
| |
|
Major
import |
Major
export |
Major
domestic cargo |
|
Steel
billess 129,278 MT |
Fertilizer 31,689 MT |
Coal 175,000 MT |
|
NPK raw
material 159,832 MT |
Iron sawdust 21,460 |
Felspar 155,713 |
|
Birimen,
chemicals 129,780 MT |
|
Gas 110,000 |
|
Wood logs
200,000 MT |
|
Cement 150,000 |
|
|
|
NPK Fertilizer 148,057 |
|
|
|
|
|
|
6.
Development Plans |
|
Project |
Cost of investment |
Implementation |
|
Construction
of wharf A3, Go Dau A terminal |
VND 25 billion |
Expected to start constructing by Jan, 2006 and
to complete by Jun, 2006 |
|
Construction
of wharf B4, Go Dau B terminal |
VND 30 billion |
Already started constructing in May, 2005 and
expected to complete by May, 2006. |
|
|
|
|
7. Main
services
- Ports
facilities operation and management
- Handling cargo, transporting cargo in/outside port
- Agent and Maritime operation services
- Taxi transporting service
- Handling and transporting cargo and equipment repair-services. |
|
|
|
Compiled by portsworldvietnam.com |
| |
|
Ports
|
Port Authorities |
Port Operators
|
| |
|
|
|
|
|
|