|
KY HA - QUANG NAM PORT |
|
|
|
Ports
|
Port
Authorities |
Port
Operators
|
| |
|
1. Port's
name & contact address: |
|
Port's name: KY HA - QUANG NAM PORT
Under: The People's Committee of Quang Nam province
Port's location: 15°28'44" N - 108°41'E
Pilot boarding position: 15°29'5"N - 108°41'7"E
Address: Tam Quang commune, Nui Thanh district, Quang Nam province
Tel.: 84.510.550054 - 550108
Fax: 84.510.872787
E-mail:
kyhaport@dng.vnn.vn
|
|
|
|
2.
Management |
|
Director |
Mr. Truong
Van Can
Tel: 84.510.550054 |
|
Vice Director, Engineering |
Mr. Vo Phuoc
Long
Tel: 84.510.550575 |
|
|
|
|
3. Access
channel:
- Length:
4,5 km.
- Channel depth: 6.5 m.
- Tidal regime: semi-diurnal.
- Average tidal range: 1.2 m.
- Maximum draft: 7.2 m.
- Maximum size of vessel accepted: 7,000 DWT. |
|
|
|
4.
Infrastructure and equipment: |
|
.Berth facilities: |
|
Name/No. |
Length |
Depth alongside |
Vessel/Cargo |
|
Wharf No.2 |
160 m |
-8.2 m |
General cargo/Container |
|
|
|
|
. Storage facilities:
Total port
area: 30,000 m2,
of which:
.
Warehouse/shed:
8,500 m2
.
Open storage:
15,000 m2
. Major equipment: |
|
Type |
No. |
Capacity |
|
Shore
crane |
5 |
15 ~ 80 MT |
|
Forklift |
3 |
3,5 MT |
|
Tractor
with chassis |
4 |
|
|
Tug
boat |
1 |
530 HP |
|
|
|
|
5. Cargo
throughput: |
|
|
2002 |
2003 |
2004 |
2005 |
|
Total |
30,000 MT |
54,000 MT |
70,000 MT |
105,000 MT |
|
Import |
1,000 MT |
15,000 MT |
7,000 MT |
10,000 MT |
|
Export |
3,000 MT |
5,000 MT |
13,000 MT |
80,000 MT |
|
Domestic |
26,000 MT |
30,000 MT |
50,000 MT |
15,000 MT |
|
Ship calls |
30 |
54 |
94 |
100 |
|
|
|
|
|
6.
Development Plans |
|
Project |
Cost of investment |
Implementation |
|
Port upgrading |
VND 14 billion |
2006 |
|
|
|
|
7. Main
services
Cargo handling,
tallying, and transporting. Warehouse and yard leasing. Marine services |
|
|
|
Compiled by portsworldvietnam.com |
| |
|
Ports
|
Port Authorities |
Port Operators
|
| |
|
|