NHA TRANG PORT
 

Ports | Port Authorities | Port Operators   

 

1. Port's name & contact address:

Port's name: NHA TRANG PORT
Under: Vietnam Maritime Administration
Port's location: 12°12'N - 109°13'E
Pilot boarding position: 12°14'5"N - 109°18'7"E & 12°10'2"N - 109°15'5"E
Address: 5 Tran Phu street, Vinh Nguyen ward, Nha Trang city, Khanh Hoa province
Tels. No.: 84.58.590021/590022/590023
Fax No.: 84.58.590017 / 5900021
E-mail: nhatrangport@dng.vnn.vn
Website: www.nhatrangport.com.vn

 

2. Management

Director

Mr. Mai Quy Nhu
Tel: 84.58.590867

Vice Director, Engineering

Mr. Lam Sanh Tuong
Tel: 84.58.590018

Vice Director

Mr. Le Nam Duong
Tel: 84.58.590875

  

3. Access channel:
- Length 5 km.
- Channel depth: 11.1m.
- Tidal regime: diurnal.
- Average tidal range: 1.4 m.
- Maximum draft: -11.8 m
- Maximum size of vessel accepted: 20,000 DWT cargo vessel, 30,000 GRT passenger vessel.

 

4. Infrastructure and equipment:

.Berth facilities:

Name/No.

Length

Depth alongside

20,000MT jetty wharf, No.3

215 m

-11.8 m

10,000MT jetty wharf, No.4

181 m

-9.2 m

10,000MT main wharf, No.2

156 m

-8.5 m

Northern access pier, No.1

60 m

-4.6 m

Wharf No.5

120 m

-4.5 m

 

 

. Storage facilities:

Total port area: 80,000 m2, of which:
              Warehouse/shed: 16,000 m2.
              Open storage: 60,000 m2, of which container yard: 20,000 m2

. Major equipment:

Type

No.

Capacity

  Mobile Shore crane

8

5 ~ 60 MT

  Forklift

1

5 MT

  Tug boat

3

400HP/700HP/1000HP

  Truck

7

 

  Trimmer

1

 

 

5. Cargo throughput:

 

2002

2003

2004

2005

Total

548,043 MT

647,267 MT

615,222 MT

671,000 MT

Import

19,406 MT

19,355 MT

16,041 MT

15,000 MT

Export

92,947 MT

96,521 MT

101,817 MT

110,000 MT

Domestic

435,690 MT

531,391 MT

487,494 MT

546,000 MT

Container

 

 

 

4,230 TEUs

Ship calls

399

467

417

497

 
 

Major imports

Major exports

  Asphalt: 12,000 MT   Wood chip: 80,000 MT
  Raw materials: 9.000 MT   Sea products: 30,000 MT
  Domestic cargoes: coal and cement
 
 

6. Development Plans

Project

Total cost of investment

Implementation

Project of port upgrading and expansion

VND 149 biliion

 Completed phase I in 2002 with the 

 investment cost of VND 60 billion.

 Phase  II is being implemented in 2006.

   

7. Main services
Cargo handling, tallying, warehousing. Tug assistances to vessels calling in or departing from the port area. Cruise and passenger services both international and domestic. Leasing out warehouses and facilities.

 

Compiled by portsworldvietnam.com 
  

Ports | Port Authorities | Port Operators   

  
Copyright 2007.  Ports World Sdn Bhd
 HomePort Location | Port Operators | Shipping ServicesWeb Links | Calendar | About Us | Contact Us