NHA TRANG PORT |
|
|
|
Ports
|
Port
Authorities |
Port
Operators
|
| |
|
1. Port's
name & contact address: |
|
Port's name: NHA TRANG PORT
Under: Vietnam Maritime Administration
Port's location: 12°12'N - 109°13'E
Pilot boarding position: 12°14'5"N - 109°18'7"E & 12°10'2"N - 109°15'5"E
Address: 5 Tran Phu street, Vinh Nguyen ward, Nha Trang city, Khanh Hoa
province
Tels. No.: 84.58.590021/590022/590023
Fax No.: 84.58.590017 / 5900021
E-mail:
nhatrangport@dng.vnn.vn
Website:
www.nhatrangport.com.vn |
|
|
|
2.
Management |
|
Director |
Mr. Mai Quy
Nhu
Tel: 84.58.590867 |
|
Vice Director, Engineering |
Mr. Lam Sanh
Tuong
Tel: 84.58.590018 |
|
Vice Director |
Mr. Le Nam
Duong
Tel: 84.58.590875 |
|
|
|
|
3. Access
channel:
- Length
5 km.
- Channel depth: 11.1m.
- Tidal regime: diurnal.
- Average tidal range: 1.4 m.
- Maximum draft: -11.8 m
- Maximum size of vessel accepted: 20,000 DWT cargo vessel, 30,000 GRT
passenger vessel. |
|
|
|
4.
Infrastructure and equipment: |
|
.Berth facilities: |
|
Name/No. |
Length |
Depth alongside |
|
20,000MT jetty wharf, No.3 |
215 m |
-11.8 m |
|
10,000MT jetty wharf, No.4 |
181 m |
-9.2 m |
|
10,000MT main wharf, No.2 |
156 m |
-8.5 m |
|
Northern access pier, No.1 |
60 m |
-4.6 m |
|
Wharf No.5 |
120 m |
-4.5 m |
|
|
|
|
. Storage facilities:
Total port
area: 80,000 m2,
of which:
Warehouse/shed: 16,000 m2.
Open storage: 60,000 m2,
of which container yard: 20,000 m2
. Major equipment: |
|
Type |
No. |
Capacity |
|
Mobile Shore
crane |
8 |
5 ~ 60 MT |
|
Forklift |
1 |
5 MT |
|
Tug boat |
3 |
400HP/700HP/1000HP |
|
Truck |
7 |
|
|
Trimmer |
1 |
|
|
|
|
|
5. Cargo
throughput: |
|
|
2002 |
2003 |
2004 |
2005 |
|
Total |
548,043 MT |
647,267 MT |
615,222 MT |
671,000 MT |
|
Import |
19,406 MT |
19,355 MT |
16,041 MT |
15,000 MT |
|
Export |
92,947 MT |
96,521 MT |
101,817 MT |
110,000 MT |
|
Domestic |
435,690 MT |
531,391 MT |
487,494 MT |
546,000 MT |
|
Container |
|
|
|
4,230 TEUs |
|
Ship calls |
399 |
467 |
417 |
497 |
|
|
|
|
| |
|
Major imports |
Major exports |
|
Asphalt: 12,000 MT |
Wood chip: 80,000 MT |
|
Raw
materials: 9.000 MT |
Sea
products: 30,000 MT |
|
Domestic cargoes: coal and cement |
|
|
|
|
|
|
6.
Development Plans |
|
Project |
Total cost of
investment |
Implementation |
|
Project of port upgrading and expansion |
VND 149 biliion |
Completed phase
I in 2002 with the
investment
cost of VND 60 billion.
Phase
II is being implemented in 2006. |
|
|
|
|
7. Main
services
Cargo handling,
tallying, warehousing. Tug assistances to vessels calling in or departing
from the port area. Cruise and passenger services both international and
domestic. Leasing out warehouses and facilities. |
|
|
|
Compiled by portsworldvietnam.com |
| |
|
Ports
|
Port Authorities |
Port Operators
|
| |
|
|