|
PHU MY PORT |
|
|
|
Ports
|
Port
Authorities |
Port
Operators
|
| |
|
1. Port's
name & contact address: |
|
Port's name: PHU MY PORT
Under: Baria Serece J. V. Company, Ministry of Planning and Investment.
Port's location: 10°35'00"~1035'30"N - 107°03'30"~107°02'02"E
Pilot boarding position: 10°19'40"N - 107°02'00"E
Address: Phu My borough, Tan Thanh district, Ba Ria-Vung Tàu province
Tels. No.: 84.64.876603 / 876604 / 876605
Fax No.: 84.64.876600/876800
E-mail:
bariaportsales@hcm.vnn.vn / bsquality@hcm.vnn.vn
Website:
www.bariaport.com |
|
|
|
2.
Management |
|
General Director |
Mr. JEAN LOUIS NACAISE
Tel:
(88.64) 876601 |
|
Deputy Director
General |
Ms. NGUYEN
THU TRANG
Tel:
84.64.876603/4/5 |
|
|
|
|
3. Access
channel:
Length 24 nautical miles
Channel depth: 9.3 m
Tidal regime: semi-diurnal.
Average tidal range: 3.8 m. Draft: 14 m.
Maximum size of vessel accepted: 60,000 DWT |
|
|
|
4.
Infrastructure and equipment: |
|
.Berth facilities: |
|
Name / No. |
Length (m) |
Depth alongside (m) |
|
T-shaped pier: |
|
- Outer side |
453 m |
at lowest tide |
|
- Inner side |
428 m |
at lowest tide |
|
|
|
|
. Storage facilities:
Total area: 129,790 m2, of which:
Warehouse/shed: 35,250 m2 (of which bonded warehouse: 17,770 m2).
Open Storage: 48,810 m2
(of which 14,525 m2 being used as bonded warehouse).
Total storage capacity: 170,000 MT.
. Major equipment: |
|
Type |
No. |
Capacity |
|
Hoppers,
conveyor belt with
covering |
|
2,500 MT/day |
|
Bagging
system |
8 lines |
240 MT/hour |
|
Scale bridge |
4 |
60 MT |
|
Shore crane
|
5 |
10~-85 MT |
|
Forklift |
12 |
3~10 MT |
|
Excavator,
bulldozer |
25 |
0.3~6 m3 |
|
Truck |
9 |
11~15 MT |
|
|
|
|
5. Cargo
throughput: |
|
|
2002 |
2003 |
2004 |
2005 |
|
Total |
1,108,553 MT |
1,422,035 MT |
|
2,267,512 MT |
|
Import |
816,357 MT |
878,693 MT |
|
1,793,692 MT |
|
Export |
Nil |
32,324 MT |
|
22,880 MT |
|
Domestic |
292,196 MT |
511,018 MT |
|
450,940 MT |
|
Ship calls |
243 |
283 |
|
401 |
|
|
|
|
|
6.
Development Plans |
|
Project |
Total cost of investment |
Implementation |
|
Purchase of 1 shore crane with capacity of 40MT
lifting and 30M outreach |
US$ 1.8 million |
2006 |
|
|
|
|
7. Main
services
Cargo handling,
bagging, and warehousing |
|
|
|
Compiled by portsworldvietnam.com |
| |
|
Ports
|
Port Authorities |
Port Operators
|
| |
|
|