|
|
|
|
|
| |
|
SAIGON PORT |
|
|
|
Ports
|
Port
Authorities |
Port
Operators
|
| |
|
1. Port's
name & contact address: |
|
Port's name: SAIGON PORT
Under: Vietnam National Shipping Lines
Port's location: 10°50'N - 106°45'E, Terminals in HCMC
Pilot boarding position: 10°20'N - 107°03'E.
Head office: 3 Nguyen Tat Thanh street, district 4, HCMC
Tels. No.: 84.8.9401825/9401826/9400826.
IDD call: 84.8.9401030/8254362
Fax No.: 84.8.9400168/8263092
E-mail:
csg@hcm.vnn.vn
Website:
www.csg.com.vn |
|
|
|
2.
Management |
|
Director |
Mr. LE CONG MINH
Tel: (84.8) 8264143 |
|
Dy Director General, Engineering |
Mr.
NGUYEN TAN TRI
Tel: (84.8) 9400857 |
|
Dy Director General, Economics |
Mr. NGUYEN THANH HUNG
Tel: (84.8) 9402975 |
|
Dy Director, Administration |
Mr. HOANG VAN NHUONG
Tel: (84.8) 9400412 |
|
Dy Director General, Operations |
Mr. NGUYEN
VAN MINH
Tel: (84.8) 9404122 |
|
|
|
|
3. Access
channel:
- Length 85 km.
- Depth: 8.5 m. Draft: 10.5m.
- Tidal regime: irregular semi-diurnal.
- Average tidal range: 2.7 m.
- Maximum size of vessel accepted: 32,000 DWT alongside and 60,000 DWT at
lighterage
area, Thieng Lieng buoy berths
|
|
|
|
4.
Infrastructure and equipment: |
|
.Berth facilities: |
|
Name/No. |
Length (m) |
Depth alongside (m) |
Vessel/Cargo |
|
Nha Rong
terminal (7 wharves) |
842 |
8.2 - 9.1 |
General/Passenger |
|
Khanh Hoi
terminal (8 wharves) |
908 |
8.2 - 10 |
General/Cont. |
|
Tan Thuan I
termina (4 wharves) |
713 |
11.0 |
Roro/Cont./Bulk |
|
Tan Thuan II
terminal (1 wharf) |
222 |
10.5 |
Bag/Bulk cargo |
|
25 Buoy
berths, 3.3 ~ 13.5 m deep |
|
|
|
|
. Storage facilities:
Total port
area: 500,000 m2
Warehouse/shed: 26 (62,042 m2)
Open storage: 257,376 m2 (of which 145,000 m2 for container stacking)
. Major equipment: |
|
Type |
No. |
Capacity |
|
Floating
crane |
1 |
100 MT |
|
RTGs |
2 |
1 over 4, 6 wide - 40 MT |
|
Harbour
mobile crane |
5 |
80 ~ 100 MT |
|
Rubber-tyred
crane |
19 |
10 ~ 30 MT |
|
Crawler crane |
3 |
25 ~ 90 MT |
|
Rail mounted
crane |
7 |
5 ~ 15 MT |
|
Reach stacker |
7 |
42 MT |
|
Forklift /
toplift |
107 |
1.5 ~ 42 MT |
|
Bulldozer /
Trimmer |
23 |
|
|
Tractor with
trailer / chassis |
19 |
for 20'/40' containers |
|
Tug boat |
19 |
425 HP & 2400 HP |
|
Bagging
equipment |
21 |
lines (alongside + in sheds) |
|
Truck |
38 |
|
|
|
|
|
5. Cargo
throughput: |
|
|
2001 |
2002 |
2003 |
2004 |
2005 |
|
Total |
10,022,000 MT |
12,077,000 MT |
10,888,806 MT |
10,533,524 MT |
10,744,131 MT |
|
Import |
4,377,000MT |
4,812,000 MT |
5,047,740 MT |
4,630,254 MT |
4,964,731 MT |
|
Export |
2,974,000 MT |
2,916,000 MT |
2,018,122 MT |
2,255,620 MT |
2,548,795 MT |
|
Domestic |
2,671,000 MT |
4,349,000 MT |
3,822,944 MT |
3,647,650 MT |
3,230,605 MT |
|
Container |
269,000 Teus |
295,000 Teus |
329,532 Teus |
300,291 TEUs |
284,506 TEUs |
|
Ship calls |
1,724 |
1,881 |
1,773 |
1,732 |
1,843 |
|
|
|
|
| |
|
Major imports |
Major exportss |
|
Container:
726,560 MT |
Container: 894,014 MT |
|
Fertilizer:
853,040 MT |
Rice: 1,646,046 MT |
|
Steel:
1,133,277 MT |
Container 105,506 MT |
|
Agricultural
products: 425,802 MT |
Agricultural products: 77,078 MT |
|
|
|
|
|
|
6.
Development Plans |
Construction of Cai Mep
Container Port and Thi Vai Multi Purpose Port in Ba Ria-Vung Tau province,
and Hiep Phuoc Port in the outskirts of Ho Chi Minh city
- Total cost of investment is around US$ 628 million estimated
- Implementation: 2005-2010.
|
|
|
|
7. Main
services
Cargo handling,
bagging, warehousing, tallying. On-land and by-waterway transports. Marine
construction. Mechanics repairs. Tug assistances and marine salvage.
Shipping agency. Ship chandler. Cargo import/export services. Forwarding and
customs clearance formalities. |
|
|
|
Compiled by portsworldvietnam.com |
| |
|
Ports
|
Port Authorities |
Port Operators
|
| |
|
|
|
|
|
|