|
|
|
|
|
| |
|
SAIGON NEW PORT |
|
|
|
Ports
|
Port
Authorities |
Port
Operators
|
| |
|
1. Port's
name & contact address: |
|
Port's name: SAIGON NEWPORT
COMPANY
Under: Ministry of Defence
Port's location:
- Tan Cang terminal: 10°47'N - 106°42'E
- Cat Lai terminal: 10°45'N - 106°47'E
Pilot boarding position: 10°20'N - 107°03'E
Address: End of Dien Bien Phu street, ward 22, Binh Thanh district, HCMC
Tels. No.: 84.8.8999034 / 8994388
Fax No.: 84.8.8980380
Email:
saigonnewport@hcm.vnn.vn
Website:
www.saigonnewport.com.vn |
|
|
|
2.
Management |
|
Director |
Mr. Nguyen Dang Nghiem
Tel: 84.8.8991395 |
|
Vice director |
Mr. Trinh
Van Moi
Tel: 84.8.8999034 Ext. 220 |
|
Vice director |
Mr. Tran
Quang Běnh
Tel: 84.8.8999034 Ext. 139 |
|
Vice director |
Mr. Tran
Dinh Thao
Tel: 84.8.8999034 Ext. 161 |
|
Vice director |
Mr. Vu Kim
Khanh
Tel: 84.8.8999034 Ext. 127 |
|
|
|
|
3. Access
channel:
Length:
- to Tan Cang terminal: 52 nautical miles
- to Cat Lai terminal: 43 nautical miles
Channel depth: -8.5 m.
Draft:-10.5 m .
Tidal regime: irregular semi-diurnal.
Average tidal range: 2.7 m.
Maximum size of vessel accepted: 30,000T container vessel
36,000T
conventional vessel |
|
|
|
4.
Infrastructure and equipment: |
|
.Berth facilities: |
|
Name/No. |
Length (m) |
Depth alongside (m) |
Vessel/Cargo |
|
C3 - Tan Cang
terminal |
171 |
-8.5 |
Cont. |
|
C4 - Tan Cang terminal |
535 |
-9.5 |
Cont. |
|
B1 - Cat Lai |
152 |
-10.5 |
Cont. |
|
B2 - Cat Lai |
151 |
-10.5 |
Cont. |
|
B4 - Cat Lai |
360 |
-12.0 |
Cont. |
|
B5 - Cat Lai |
310 |
-10,5 |
Cont. |
|
3
buoy berths at Cat Lai area, 10.5m ~ 12m deep |
|
|
|
|
. Storage facilities:
Total port area: 2,094,964 m2
Warehouse/shed: 122,000 m2 m2
(of which CFS of 28,200 m2, and bonded warehouse of 12,000 m2).
Open storage: 488,000 m2, 5 high stacking of containers
Storage capacity: 33,600 TEUs equivalent to 505,000 MT
. Major equipment: |
|
Type |
No. |
Capacity |
|
Floating
crane |
1 |
100 MT |
|
Mobile gantry
crane for handling container |
10 |
35 Cont./Hour |
|
Rail-mounted
mobile crane for handling
container |
2 |
25 Cont./Hour |
|
Quayside-fixed crane for handling
container
|
8 |
25 Cont./Hour |
|
Rubber tyre
gantry crane - RMGC |
6 |
25 Cont./Hour |
|
Autocrane |
3 |
65 ~ 400 MT |
|
Forklift for
laden cont. |
23 |
45 Cont./Hour |
|
Forklift for
empty cont. |
12 |
30 Cont./Hour |
|
Tractor with
trailer |
130 |
176 - 340 CV |
|
Container-transport barge |
4 |
16~54 TEUs |
|
|
|
|
5. Cargo
throughput: |
|
|
2002 |
2003 |
2004 |
2005 |
|
Total |
5,589,000 MT |
7,500,000 MT |
11,048,823 MT |
14,570,000 MT |
|
Import |
2,421,062 MT |
3,773,970 MT |
4,823,400 MT |
6,329,921 MT |
|
Export |
2,739,067 MT |
3,408,600 MT |
5,795,155 MT |
7,604,500 MT |
|
Domestic |
428,671 MT |
3,714,301 MT |
430,268 MT |
635,579 MT |
|
Container |
475,000 TEUs |
700,000 TEUs |
879,504 TEUs |
1,056,000 TEUs |
|
Ship calls |
824 |
1,344 |
1,388 |
1,544 |
|
|
|
|
|
6.
Development Plans |
|
Project |
Cost of investment |
Time planning |
|
Purchase of 3 quayside gantry cranes for handling
container |
VND 170 billion |
2006-2007 |
|
Expansion of Cai Lan terminal, phase II |
VND 252,3 billion |
2005-2008 (being completed in 2008) |
|
Construction of up-stream Cai Mep container port,
phase I |
VND 591,7 billion |
Operations being commenced in 2008 |
|
Construction of Maritime Trading Center |
VND 500 billion |
Operations being commenced in 2008 |
|
|
|
|
7. Main
services
Cargo
handling and warehousing.
ICD
and bonded warehouse services.
On-land and
by-waterway transports.
Tallying cargoes
im/exported.
Marine search and
rescue.
Tugboat services
to ocean vessels.
Building &
repairing of construction works.
Supply of
shipping agency
Brokers
planned to put in services. |
|
|
|
Compiled by portsworldvietnam.com |
| |
|
Ports
|
Port Authorities |
Port Operators
|
| |
|
|
|
|
|
|