|
SONG HAN PORT |
|
|
|
Ports
|
Port
Authorities |
Port
Operators
|
| |
|
1. Port's
name & contact address: |
|
Port's name: SONG HAN PORT
Under: Da Nang Ocean Shipping and Trading Co. - Da Nang City's Department of
Transport and Public Works
Port's location: 16°03'40"N - 108°13'6"E
Pilot boarding position: 16°10'N - 108°11'E
Address: 156 Bach Dang St., Da Nang City
Tels. No.: 84.511.822977
Fax No.: 84.511.834796
E-mail:
danaship@dng.vnn.vn |
|
|
|
2.
Management |
|
Company Director |
Mr. Phan
Hoai Nguyen
Tel: 84.511.822065 |
|
Vice Director, Operations |
Mr. Le Viet
Hoi
Tel: 84.511.822977 |
|
|
|
|
3. Access
channel:
Length 13 km.
Depth: 7.0 m.
Average tidal range: 0.9 m.
Tidal regime: semi-diurnal. Draft: 7.9 m.
Maximum size of vessel accepted: 2,900 GRT. |
|
|
|
4.
Infrastructure and equipment: |
|
.Berth facilities: |
|
Name/No. |
Length |
Depth alongside |
Vessel/Cargo |
|
Wharf No.9 |
60 m |
-7 m |
General cargo |
|
|
|
|
. Storage facilities:
Total port
area: 1,320 m2, of which:
Warehouse/shed: Nil. Open storage: 800 m2.
. Major equipment: |
|
Type |
No. |
Capacity |
|
Rubber-tyred crane |
2 |
15 MT |
|
|
|
|
|
| |
|
Major imports |
Major exportss |
|
Clinker 205,009 MT |
Sandal chips 413,868 MT |
|
Container 158,281 MT |
Sand 180,156 MT |
|
Fertilizer 44,421 MT |
Container 105,506 MT |
|
Steel 46,117 MT |
|
|
Domestic cargoes consist of klinker, cement, container, and
coal |
|
|
|
|
|
|
5.
Development Plans |
Relocating the existing port and constructing a new terminal at Vung Thung-Son
Tra
- Total investment capital: VNĐ 70 billion
- Implementation: being conducted (Planning
time: 2 years) |
|
|
|
6. Main
services
Stevedoring and
transporting |
|
|
|
Compiled by portsworldvietnam.com |
| |
|
Ports
|
Port Authorities |
Port Operators
|
| |
|
|